Cromer Road interchange

The Cromer Road interchange on the Norwich Northern Distributor Road (NNDR) project involves the construction of a new overbridge to take the re-aligned A140 Cromer Road over the NNDR.

The A140 is one the primary traffic routes into Norwich city centre.

The design of the new bridge placed it very close to the edge of the existing Cromer Road and as such, it would need to be constructed while traffic was still using the existing road. Initial construction planning highlighted that extensive temporary works that would be required to construct the bridge.

Initial feedback from the supply chain was that these temporary works were envisaged to cost approximately £500k. In order to mitigate the potential cost and time impacts on the project, BB proposed that the design alignment of the new Cromer Road be amended to move the new bridge further away from the existing road.

By employing the services of Cassidy Forsythe LTD, a specialist BIM Engineer was able to produce an integrated 3D model for the proposed road realignment and bridge repositioning. This model included all relevant temporary and permanent works items, including highway alignment, utility diversions and earthworks slopes.

The model demonstrated that the road could be realigned within the applicable highway design standards, without necessitating a formal change to the scheme DCO. As a result of the bridge being repositioned, the scope of the temporary works was significantly reduced – as shown in the screenshot from the model below.

cromer-road-interchange

The price of the revised sheet piles amounted to £110k and programme savings in the region of four weeks were also achieved from the reduced temporary works scope. The difference in cost between the original temporary works and the revised temporary works has realised savings amounting to approximately £400k. These savings are directly attributable to the BIM Engineer’s ability to create 3d models of the bridge and challenge to design provided by the client.

The model was presented to the Client’s lead designer, which he subsequently accepted and incorporated into their overall model for the NNDR scheme.

Contact Us

Cassidy Forsythe

Town Hall Chambers

High Street East

Wallsend

North Tyneside

NE28 7AT

T: 0800 0614594

E: info@cassidyforsythe.com

www.cassidyforsythe.com

linkedin

Featured Video

  • UK Construction Online’s Stakeholder page offers you the chance to find and learn about the leading companies in the UK Construction Industry.

    Featuring the very best suppliers and operators in the sector our stakeholder’s pages offer detailed information about the company, their latest case studies and press releases, plus products and services and testimonials.

    We work with our stakeholders to constantly update and maintain this database to ensure that the information is relevant and helpful for those looking to source premium quality companies in the UK construction market.

    You can ‘View all Stakeholders’ or use the drop down menus to find specific stakeholders via their company name or by sector.

    Join the Fastest Growing Community for Construction

    UK Construction Online's Stakeholder package quickly connects your company to our vast audience of over 250,000 visitors a month.

    View our latest Alexa ranking:

    What is a Stakeholder?

    A stakeholder is a Mircosite that has the power to highlight a product or service, launch a promotion, or promote brand awareness to the construction industry in a way that full websites or more traditional marketing cannot.

    All stakeholders have the ability to have their latest press releases and case studies promoted across the UK Construction Online platform. UK Construction Online is updated daily, with the latest news across all sectors within the construction industry and all stakeholders are promoted on both social media and to a mailing list of over 122,000 subscribers.

    UK Construction Media
    0800 6127680
    enquiries@promarkmedia.co.uk