Martin Young from Cassidy Forsythe was asked to create a 3d model of Rackheath bridge in order to demonstrate the construction sequence to Network Rail.

As a result of this model it became apparent that the reinforced concrete could not be constructed as designed by the client.

The problems found were as follows :

  • Due to the length of the longitudinal bars it would be extremely difficult to install them between steel beams already installed
  • Closed links would be impossible to install due to the intermediate bracing between the beams
  • Stirrup reinforcement clashed with the intermediate bracing

These problems only became apparent once the 3d model had been created and helped to avoid costly delays.

The solutions Martin Young suggested to the client were as follows :

  • Change the longitudinal reinforcement bars so that the bars could be installed on the ground before the steel beams are lifted into place
  • Change the closed links to open U bars so that they could be fixed after the intermediate bracing
  • Move the stirrup reinforcement or move the intermediate bracing away from the reinforced concrete beam

The proposed changes would allow the majority of the reinforcement to be installed on the ground, reducing the inherent risk of installing reinforcement at height, during a rail possession at night.

The problems highlighted by the 3d model can be seen from the screenshots below:

rackheath-railway-bridge-cassidy-forsythe

Diaphragm beam reinforcement with clashes with bracing

cassidy-forsythe-rackheath-railway-beam

3d model of preferred reinforcement showing additional short straight bars

If Balfour Beatty had attempted to construct the bridge without the 3d modelling it would have been impossible to fix the reinforcement as designed.

This would have led to wasted possessions including costs for plant, people and materials, together with delays to the programme.

Bearing in mind that a 1000t crane was intended to be used for lifting the beams into place, the costs for the aborted work could easily be in the region of £500,000

Contact Us

Cassidy Forsythe

Town Hall Chambers

High Street East

Wallsend

North Tyneside

NE28 7AT

T: 0800 0614594

E: info@cassidyforsythe.com

www.cassidyforsythe.com

linkedin

Featured Video

  • UK Construction Online’s Stakeholder page offers you the chance to find and learn about the leading companies in the UK Construction Industry.

    Featuring the very best suppliers and operators in the sector our stakeholder’s pages offer detailed information about the company, their latest case studies and press releases, plus products and services and testimonials.

    We work with our stakeholders to constantly update and maintain this database to ensure that the information is relevant and helpful for those looking to source premium quality companies in the UK construction market.

    You can ‘View all Stakeholders’ or use the drop down menus to find specific stakeholders via their company name or by sector.

    Join the Fastest Growing Community for Construction

    UK Construction Online's Stakeholder package quickly connects your company to our vast audience of over 250,000 visitors a month.

    View our latest Alexa ranking:

    What is a Stakeholder?

    A stakeholder is a Mircosite that has the power to highlight a product or service, launch a promotion, or promote brand awareness to the construction industry in a way that full websites or more traditional marketing cannot.

    All stakeholders have the ability to have their latest press releases and case studies promoted across the UK Construction Online platform. UK Construction Online is updated daily, with the latest news across all sectors within the construction industry and all stakeholders are promoted on both social media and to a mailing list of over 122,000 subscribers.

    UK Construction Media
    0800 6127680
    enquiries@promarkmedia.co.uk