Owning or building a holiday home in Spain can be quite taxing when it comes to installing basic utilities, says one our valued customers in the foothills of Sierra Nevada in Andalucia, southern Spain. Although it may appear to be a straightforward process, acquiring a mains electricity supply can quickly career into a long-winded, stressful affair involving Spanish neighbours and the authorities, ultimately resulting in spiralling costs in terms of money and time, making a mains connection impractical. Sandy Spink comments,

It was going to cost €40,000 to install the mains to my new holiday home and it was going to take a very, very long time, it was simple – we needed another reliable solution”.

The solution chosen to provide their reliable electrical supply, was the Powerguard PS System which was installed by the Powerguard service team within 2 days. Fundamentally, the PS system is a small power station which provides a very stable and reliable 230V electrical supply. The fully-integrated PS System comprises of a diesel generator set, a battery bank and a power inverter.  Unlike a standalone generator which would run for 24hrs, the PS system only needs to turn on the generator during periods when the electrical demand is high e.g. for a power shower, cooker or heating. This high demand period usually equates to less than 8hrs per day and if these periods are regular, the PS System can be programmed to turn on the generator automatically. For all other times when the demand is low, the system powers the home using the revolutionary battery pack and inverter. Sandy explains,

Our system typically operates the generator for less than six hours a day with two set periods; one period between 7am and 10am and the second between 5pm and 7pm. The morning run simply recharges the batteries from any overnight use but because we all get up at this time, any appliances can be turned on without any use of the batteries – we time it so this happens. In the evening, we time the generator so we can have dinner using the cooker and perhaps have showers – again without using the batteries.”

The clever part of the PS System is that during periods when the demand is high, any unused power is used to recharge the batteries. The energy stored within the batteries is then used to provide AC mains power to the Villa for the remainder of the day and night i.e. when the demand is low. During the day, if more power is required than that provided by the batteries, the PS System’s microprocessor automatically turns on the generator, and subsequently switches it off after the load has reduced. The payback on an integrated PS System over a stand-alone generator is usually around 3 years.

To facilitate further fuel savings, the system can also handle inputs from renewable generation sources to recharge the batteries such as solar panels. Furthermore, the CHP option (also installed in holiday homes in southern Spain) provides free hot water for mains and heating whilst increasing efficiency to over 80%! Sandy comments,

The system is very economical and reliable, I have no issues with recommending this system to similar people to myself who require a mains electricity supply for their holiday home but are not able to secure a utility mains connection.”

Contact Us

Power Machines Ltd

1 Torridon Court,

Bolingbroke Road,

Fairfield Industrial Estate,

Louth,

Lincolnshire,

LN11 0WN

T: +44 (0)1507 600688

F: +44 (0)1507 600621

E: sales@powerguard.co.uk

www.powerguard.co.uk

linkedin

  • UK Construction Online’s Stakeholder page offers you the chance to find and learn about the leading companies in the UK Construction Industry.

    Featuring the very best suppliers and operators in the sector our stakeholder’s pages offer detailed information about the company, their latest case studies and press releases, plus products and services and testimonials.

    We work with our stakeholders to constantly update and maintain this database to ensure that the information is relevant and helpful for those looking to source premium quality companies in the UK construction market.

    You can ‘View all Stakeholders’ or use the drop down menus to find specific stakeholders via their company name or by sector.

    Join the Fastest Growing Community for Construction

    UK Construction Online's Stakeholder package quickly connects your company to our vast audience of over 250,000 visitors a month.

    View our latest Alexa ranking:

    What is a Stakeholder?

    A stakeholder is a Mircosite that has the power to highlight a product or service, launch a promotion, or promote brand awareness to the construction industry in a way that full websites or more traditional marketing cannot.

    All stakeholders have the ability to have their latest press releases and case studies promoted across the UK Construction Online platform. UK Construction Online is updated daily, with the latest news across all sectors within the construction industry and all stakeholders are promoted on both social media and to a mailing list of over 122,000 subscribers.

    UK Construction Media
    0800 6127680
    enquiries@promarkmedia.co.uk