Stakeholder - FP McCann


Holiday Inn Express Group specifies FP McCann’s Modular Precast Frame Solution

Site: Holiday Inn Express (HIEx), Bridgwater

Contractor: Midas Construction

Client: Zeal Hotel Group

Frame Installation Contractor: S4J Ltd.

Products Supplied: Brick faced and acid etched ‘sandwich’ cladding panelsprecast concrete reinforced solid floor slabsinternal walls and stairs

FP McCann’s structural precast concrete building and architectural facades division is supplying and installing the complete package of modular precast components on a brand new £10 million hotel near Bridgwater, Somerset. Working on behalf of main contractor Midas Construction, experienced sub-contracting partner to FP McCann, S4J Ltd, is undertaking the precast frame build.

The 138 room accommodation situated at Junction 24 of the M5 motorway is one of the Zeal Hotel group’s new Gen 4 hotel schemes for Holiday Inn Express (HIEx) developments. Once complete in spring 2019, it is ideally located to part serve the local workforce and visitors to the new Hinkley Point C nuclear power station. Architect on the project is Aros and the consultant structural engineer is Clegg Associates, who have also employed the design services of Practech Design Studio (PDS) for the detailing of the external façade.

The four storey building is well underway with work having commenced in March this year. In total, around 509 individual precast concrete structural andarchitectural units will make up the precast structural frame including 394 structural products consisting of reinforced concrete solid floor slabsinternal walls and stairs all manufactured at FP McCann’s Grantham depot.

The building’s architectural façade has been specifically designed to incorporate both a brick faced and acid etched finish. The decorative cladding panels are of an insulated ‘sandwich’ construction, specially cast to meet the exacting design brief. The 30 brick faced panels, each 365mm thick, are being manufactured at Grantham and 84 acid etched panels from Littleport are 410mm thick, with two different colour shades to match the architectural design requirements.

The insulation layer sits between the inner and outer concrete faces on each sandwich panel and have been designed to accommodate the aluminium framed 0.18 U value windows, supplied by Window Glass (Bristol) Ltd, all pre-installed into the precast panels prior to delivery. A single handling operation on site then ensures that the architectural panels are installed quickly and efficiently with minimal risk of damage.

The precast wall and floor sections have been designed for ease of build, linking together with hidden tie rods. Joints are finished with a high-strength non-shrink grout. As part of the contract, S4J Ltd are also installing 130 pre-formed bathroom pods supplied by Somerset-based company, Off Site Solutions (RT) Ltd.

Both the structural and architectural facade teams at FP McCann have worked closely with the engineers and architects on the project to ensure all aspects of the build meet the exacting client specification.

Commenting on the building progress to date, Grant Millar, Operations Manager for Midas Construction says, “This method of modular precast construction demonstrates a number of efficiencies compared with practices associated with a traditional build. The remote manufacturing of the building components offers significant advantages in terms of product quality and integrity. On site, speed of construction, minimising waste and the ability to work uninterrupted in all weather conditions are all major benefits. Additionally, thesandwich panel external facade system removes the need for scaffolding, thereby minimising the health and safety risk factors associated with people working at height.”

For further information on FP McCann’s architectural & structural solutions, contact the team at:

London Office: 020 3905 7640 | Byley Office: 01606 843500 | sales@fpmccann.co.uk

Contact Us

FP McCann

Head Office

3 Drumard Road

Knockloughrim

Magherafelt

BT45 8QA

T: (NI) 028 7964 2558

T: (GB) 01530 240000

F: 028 7964 4224

E: sales@fpmccann.co.uk

www.fpmccann.co.uk

facebooktwitterlinkedinInstagram-Icon-roundgoogleplus

Featured Video

Company eBook

Testimonials


The precast concrete units are a simple and cost-efficient means of installing an earth retaining barrier. In the case of the Tividale scheme, we have clad the exposed element of the wall with a brick finish another benefit of the smooth factory finish.

Brendan Lines, Site Manager, Friel Construction Ltd

The FP McCann technical and commercial teams at Lydney have worked closely with us throughout the programme of delivery and installation of the panels. The robust precast concrete walling system in place will accommodate any changes in  the use of the facility by Peel Ports in the future.

Darryn Davies, Project Manager, McLaughlin and Harvey
See all
  • UK Construction Online’s Stakeholder page offers you the chance to find and learn about the leading companies in the UK Construction Industry.

    Featuring the very best suppliers and operators in the sector our stakeholder’s pages offer detailed information about the company, their latest case studies and press releases, plus products and services and testimonials.

    We work with our stakeholders to constantly update and maintain this database to ensure that the information is relevant and helpful for those looking to source premium quality companies in the UK construction market.

    You can ‘View all Stakeholders’ or use the drop down menus to find specific stakeholders via their company name or by sector.

    Join the Fastest Growing Community for Construction

    UK Construction Online's Stakeholder package quickly connects your company to our vast audience of over 250,000 visitors a month.

    View our latest Alexa ranking:

    What is a Stakeholder?

    A stakeholder is a Mircosite that has the power to highlight a product or service, launch a promotion, or promote brand awareness to the construction industry in a way that full websites or more traditional marketing cannot.

    All stakeholders have the ability to have their latest press releases and case studies promoted across the UK Construction Online platform. UK Construction Online is updated daily, with the latest news across all sectors within the construction industry and all stakeholders are promoted on both social media and to a mailing list of over 122,000 subscribers.

    UK Construction Media
    0800 6127680
    enquiries@promarkmedia.co.uk