News - Construction News
LOD simply explained: The LOD Kiwi

Trimble explains how LOD and LOG can improve Building Information Modelling.
In the world of Building Information Modeling (BIM), LOD stands for the Level of Development. As the required LOD can have a major impact on the size of your model, it’s useful to make a distinction between LOI and LOG.
The Level of Development can best be understood as a reference to the reliability of your model. It’s the degree to which an element’s geometry and attached (non-graphic) information have been thought through. In order to explain how this works, we’ll use a piece of fruit:
LOD = LOG + LOI
For this simplified representation of LOD = LOG + LOI, we have chosen a kiwi, which is divided into the LOG (Level of Geometry) and LOI (Level of Information).
LOG: Level of Geometry
The outside, the visible part of the LOD-kiwi, is the Level of Geometry (also called level of detail). It tells us something about the appearance (the geometry) of the element. The LOG in a BIM model expresses the geometric level of detail. For example, EMCS 4.0 distinguishes between 5 different levels, where LOG 1 stands for a schematic or symbolic representation of a product, and LOG 5 for a detailed, manufacturer-specific representation.
LOI: Level of Information
The invisible, nongeometric part of the kiwi is the LOI or Level of Information. In the example of the LOD kiwi, this is the taste, the colour, the smell, the price, and the expiry date.
In BIM models, the LOI stands for the non-geometric, technical information of a model. Content with a high LOI, for example, contains manufacturer-specific information such as price and stock information.
Get lean with LOD
Normally, the detail level of the geometry and the level of information both increase as a project progresses. However, there can be large differences between the LOI and the LOG: A component can have a symbolic representation, while the information is fully specified including manufacturer specific properties.
Differentiating between LOI and LOG is useful for managing expectations and making agreements, which benefits both the efficiency and communication within BIM projects.
Would you like to learn more about LOD and how to deal with it efficiently? Find out how the different LOD levels impact your building model.
Related Articles
More News
- SME firms celebrate joining £94M social housing framework
1 Aug 25
More than 50 contractors have won their bids for work in a new £94M social
- Plans for a direct rail link between London and Germany
31 Jul 25
UK and Germany establish a joint taskforce to explore a new direct rail link between the
- £63M boost for Britain’s electric vehicle revolution
30 Jul 25
£63M investment package to supercharge Britain’s electric vehicle infrastructure.