Market Leads & Opportunities

Engineering design services in Milton Keynes – Framework Lead

Source: http://www.trackerintelligence.com

The current contract for Engineering design services in Milton Keynes is projected to end on 26/3/2018 and may be available for re-tender.The current contract for Engineering design services in Milton Keynes included Multi-functional Design of Switch and Crossing Works to sections of railway track and associated infrastructure throughout the UK rail network. The design will be progressed from the particular requirements provided by Network Rail through outline design development to validate the scope of the engineering elements, through the detailed design and the production of as built records of the delivered works.Network Rail may wish for the successful tenderer(s) to form part of an Alliance with contractors for Switch and Crossing Track Works. A separateContract Notice has been issued for Switch and Crossing Track Works which may form part of an Alliance.