Market Leads & Opportunities

Construction work in Peterborough – Framework Lead

Source: http://www.trackerintelligence.com

The current contract for Construction work in Peterborough is projected to end on 28/5/2018 and may be available for re-tender.The current contract for Construction work in Peterborough included Study, design and/ or build and /or repair/ maintain capital works on assets as part of planned programmes of work. This will include but not be limited to installation and repair of meters, potable and non potable water and waste water infrastructure (including but not limited to sewerage systems and ancillaries, water mains systems and ancillaries, sea outfalls and tunnels), potable and non potable water and waste water non infrastructure (including but not limited to service reservoirs, water towers, pumping stations, water treatment works, wastewater treatment works and sludge treatment works).Start dates for each lot may be staggered. It is anticipated that agreements shall be signed by April 2014 to commence April 2015 (transition period) with the exception of metering which may start earlier or later than April 2015. Appointed Alliances across the lots may be required to start work during the transition period as part of an early start programme.