Market Leads & Opportunities
United Kingdom-Manchester: Bins – Framework Lead
The current contract for Bins – Framework Lead is projected to end on 26-JUL-19 and may be available for retender.
Description:
Title attributed to the contract by the contracting authority:: Recycling Bins and Street Furniture.
Type of contract and location of works, place of delivery or of performance: Supplies
Purchase
NUTS code
Information on framework agreement: Framework agreement with several operators
Duration of the framework agreement
Duration in years: 4
Estimated total value of purchases for the entire duration of the framework agreement
Estimated value excluding VAT:
Range: between 2 938 824 and 11 755 296 GBP
Short description of the contract or purchase(s): The NWUPC has a requirement to establish a Framework Agreement for the supply of Recycling Bins and Street Furniture. The Authority is managing this procurement process in accordance with the Public Contracts Regulations 2006 (the “Regulations”) on behalf of members of NWUPC, APUC, HEPCW, LUPC, NEUPC, SUPC and CPC.
A list of members can be located at:
NWUPC<a href=
>
APUC !/members
HEPCW<a href=
>
LUPC<a href=
>
NEUPC<a href=
>
SUPC<a href=
>
CPC<a href=
>
1.2.2 The Authority is procuring the Framework Agreement as a central purchasing body for itself and Other Contracting Bodies (OCB). This means that OCBs referred to in the OJEU Notice may also participate in the Framework Agreement.
1.2.3 The Contract Notice has been advertised in the Supplement to the Official Journal of the European Union and the Tender is being conducted under the EU Procurement Directives, Restricted Procedure.
This Framework Agreement will commence on 1.9.2015 for an initial period of 36 months until 31.8.2018 with the option to extend the Agreement for 12 months until 31.8.2019 subject to satisfactory supplier performance.
1.3.3 The Framework Agreement will be split into two lots as follows:
Lot 1 – Recycling Bins
Lot 2 – Street Furniture
1.3.4 The Supplier can apply for a single lot or for multiple lots. You only need to complete and return one PQQ regardless of the number of lots you wish to apply for. The PQQ will be evaluated once and the score achieved will be used for each lot you have opted to apply for. Each lot will be awarded separately and a successful award on a particular lot does not enable You to supply under any other Lot. Please indicate which lot or lots you wish to apply for in Section 7.
1.3.5 Lot 1 Recycling Bins includes, but is not limited to, the following scope; internal bins; external bins; metal bins; plastic bins; lockable bins; non-lockable bins and sack retention systems in a range of sizes and weights and with a variety of fixings and signage requirements. These products will be utilised in a range of areas including, residential accommodation, kitchens, teaching rooms, office spaces and gymnasiums. This list is not exhaustive.
1.3.6 Lot 2 Street Furniture includes, but is not limited to, the following scope; seating; benches; bollards; planters; bike shelters; bike parking; smoking shelters. This list is not exhaustive.
All Agreements resulting from this Tender should be made available to and apply to all current and future members of the participating consortia. It should also apply, with the express written permission of the Authority, to any member of any other Higher or Further Education regional purchasing consortium or any other Higher Education Institution in the United Kingdom as well as the Research Councils, providing that they formally commit to participate in and support this Agreement. The Authority will only grant permission at the request of the consortium; or an Institution if it is not a member of a Consortium. This Agreement is not intended to replace any current Agreements that either participating or non-participating Consortia may already have in place. A list of the members of the HE and FE regional purchasing consortia is as follows:
APUC !/members
HEPCW<a href=
>
LUPC<a href=
>
NEUPC<a href=
>
SUPC<a href=
>
CPC<a href=
>
Information about variants: Variants will be accepted: no
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
