Market Leads & Opportunities
JS Wright Secures £17m – Plus Deal for London’s Silk District
Building services provider J S Wright has secured a contract worth in excess of £17 million to fit out a luxury residential development in East London. The Birmingham-based company, which has an office at Trafalgar Square in London, will design and build all the mechanical and electrical services for the first phase of The Silk District in Whitechapel. J S Wright will provide the services for a total of 412 homes and communal areas that make up the first phase of a larger development that will total 648 homes being built on the site of a former storage facility for joint venture partners Mount Anvil and L&Q. The company will provide the services for The Jacquard and The Georgette, two buildings of 20 floors and seven floors respectively that also include a residents’ workspace, cinema room, gym and a 24-hour concierge. Their total of 412 studio, one, two, three and four-bed apartments will comprise 303 for private sale and 109 affordable homes to be managed by L&Q. The mechanical works will include providing each apartment with low-pressure hot water heating through a mixture of either thermostatically controlled under-floor heating or radiators fed by a heat interface unit from a combined heat and power system in a central plant room. The heat interface units will arrive on easy-to-fit utility cupboards manufactured off-site by J S Wright’s in-house prefabrications department, saving construction time and reducing the number of trades required on site. The company will also install a boosted cold-water tank room and distribution network to supply all the homes with instant domestic hot and cold-water services. In addition, J S Wright will equip both buildings with a mechanical ventilation heat recovery system to reduce energy costs. It will also supply and install sanitary ware, an internal rainwater system and above ground drainage, along with building management system controls. The brief also includes installing domestic sprinklers, smoke and environmental ventilation, and wet and dry risers in all areas including underground parking. J S Wright will also carry out electrical installations, including lighting, fire alarm, power and TV infrastructure in each apartment. It will also install an M-Bus credit metering system to record energy consumption. Work is scheduled to begin on site later this month (September) and completion is scheduled for September 2021.
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
