Market Leads & Opportunities

United Kingdom-Worthing: Construction work for water projects – Framework Lead

Source: Tracker Intelligence

The current contract for Construction work for water projects – Framework Lead is projected to end on 09-MAR-21 and may be available for retender. Package Lamella Tank Units.
Package Lamella Tank Units.
Standardization of Package Lamella Tank Units for the water and waste-water treatment.
Overview
The Subcontract work scope is for a turnkey installation comprising of:
– A standard design;
– Manufacture;
– Installation;
– Test and commission;
– O&M Manuals;
– 3D drawings.
Elements of Work
The Subcontract works are deemed to include the following elements:
– Project Management;
– Full design, 3D drawings and calculations;
– Access;
– Site Supervision;
– Method statement and risk assessments;
– Specialist equipment hire;
– Health and Safety;
– Site and operational constraints;
– Supply, delivery and installation.
Standardization of Package Lamella Tank Units for the water and waste-water treatment.
Overview
The Subcontract work scope is for a turnkey installation comprising of:
– A standard design;
– Manufacture;
– Installation;
– Test and commission;
– O&M Manuals;
– 3D drawings.
Elements of Work
The Subcontract works are deemed to include the following elements:
– Project Management;
– Full design, 3D drawings and calculations;
– Access;
– Site Supervision;
– Method statement and risk assessments;
– Specialist equipment hire;
– Health and Safety;
– Site and operational constraints;
– Supply, delivery and installation.
Common procurement vocabulary (CPV): 45240000, Construction work for water projects, 51500000, Installation services of machinery and equipment, 51100000, Installation services of electrical and mechanical equipment,