Market Leads & Opportunities

United Kingdom-Trowbridge: Construction work – Framework Lead

Source: Tracker Intelligence

The current contract for Construction work – Framework Lead is projected to end on 18-APR-21 and may be available for retender. Wiltshire Highways Contract.
Structure of Contract.
It is intended that on completion of the tender exercise that the successful tenderer will enter into separate contracts with each of Wiltshire Council and Swindon Borough Council. Each contract will be on the same terms with the same specification although there will be different minimum spend commitments for each contract and TUPE and Pension provisions will be substantially different in each.
Construction, foundation and surface works and maintenance of highways and roads.
T-junction construction work, Roundabout construction work, Construction work for highways, highway maintenance work, Roadworks, Road-maintenance works, Road-repair works, Traffic-calming works, Paths and other metalled surfaces, Footpath construction work, Cycle path construction work, Various surface works, Surface work for highways, Surface work for roads, Road-surface painting work, Paving and asphalting works, Carriageway resurfacing works, Dual carriageway construction work, Single carriageway construction work, Access road construction work, Surface coating construction work, Verge maintenance work, Surfacing work except for roads, Resurfacing works, Surface work for streets, Surface work for footpaths, Pedestrian ways construction work, Pedestrian zone construction work, Parking-lot-surface painting work, Erection of road-barriers, Installation of road signs, Installation of bollards, Installation of safety equipment, Installation of street furniture, Installation of road signals, Foundation work for highways, roads, streets and footpaths.
Construction and maintenance work for bridges and subways.
Construction work for bridges, Bridge construction work, Road bridge construction work, Footbridge construction work, Construction work for iron bridges, Construction work for steel bridges, Bridge renewal construction work, Construction work for tunnels, shafts and subways, Covered or partially-covered excavations, Underpass, Covered or partially-covered road excavations, Culverts.
River regulations and flood control works.
Flood-prevention works, Flood-defences maintenance works,
Maintenance service of public-lighting installations,
Street-lighting maintenance services, Commissioning of public lighting installations.
Common procurement vocabulary (CPV): 45000000, 71000000, 71240000, 45230000, 71241000, 72242000, 44212120, 45221100, 45233100, 45111100, 45233139, 45233120, 45442121,