Market Leads & Opportunities
United Kingdom-Ashington: Water-treatment work – Recurrent Lead
The current contract for Water-treatment work – Recurrent Lead is projected to end on 22-JUN-21 and may be available for retender. Water Hygiene.
Water Hygiene.
Contract for water hygiene monitoring services for Bernicia Homes.
The requirements include –
– Monthly monitoring and temperature testing;
– 6 monthly tank inspections;
– Annual Tank Cleans (arranged upon results of monitoring inspections);
– Quarterly Shower Cleans (sheltered only);
– TMV temperature testing/servicing.
This contract may also include risk assessments. Training may also be required to be delivered by the successful tenderer throughout the term of the contract.
Please note tenderers must be able to confirm they are members of the Legionella Control Association and that their organisation has an electronic database system for use to manage site visit reports, temperature records and non compliance reports. These are mandatory requirements. Tenders will not be evaluated if tenderers cannot confirm these requirements.
Contract for water hygiene monitoring services for Bernicia Homes.
The requirements include –
– Monthly monitoring and temperature testing;
– 6 monthly tank inspections;
– Annual Tank Cleans (arranged upon results of monitoring inspections);
– Quarterly Shower Cleans (sheltered only);
– TMV temperature testing/servicing.
This contract may also include risk assessments. Training may also be required to be delivered by the successful tenderer throughout the term of the contract.
Please note tenderers must be able to confirm they are members of the Legionella Control Association and that their organisation has an electronic database system for use to manage site visit reports, temperature records and non compliance reports. These are mandatory requirements. Tenders will not be evaluated if tenderers cannot confirm these requirements.
Common procurement vocabulary (CPV): 45232430, Water-treatment work, 09321000, Hot water, 24962000, Water-treatment chemicals, 31141000, Water coolers, 31161400, Primary water systems, 38421100, Water meters, 39137000, Water softeners, 39370000, Water installations, 42122130, Water pumps, 42122161, Cooling-water pumps, 42161000, Hot-water boilers, 44212233, Water towers, 44611500, Water tanks, 44613210, Water chambers, 44613500, Water containers, 44621210, Water boilers, 45232431, Wastewater pumping station, 45259100, Wastewater-plant repair and maintenance work, 45332200, Water plumbing work, 65130000, Operation of water supplies, 71800000, Consulting services for water-supply and waste consultancy, 90733100, Surface water pollution monitoring or control services, 90733400, Surface water treatment services, 90733700, Groundwater pollution monitoring or control services,
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
