Market Leads & Opportunities

Triton wins Doncaster school work

Source: https://www.theconstructionindex.co.uk/all-construction-news

Triton Construction has been awarded two separate contracts, valued at more than £6m, for building works at a secondary school in Doncaster.The employee-owned contractor has been brought in to provide a significant refurbishment and new-build teaching facilities Astrea Academy Woodfield.The school estate, on Weston Road in Doncaster, comprises a cluster of interconnecting buildings constructed in different phases over a period of expansion. Some of the buildings now need updating.The first contract awarded to Triton includes the demolition of an existing classroom block to make way for a new 11,500 sq ft, single storey building with IT and technology rooms. The programme of works will allow for phased occupancy to minimise disruption.The second contract includes a new assembly hall with remodelled school entrance and new dance and drama studios. The 16,000 sq ft block will also incorporate a kitchen, medical room, prayer room and offices.Working alongside AHR Architects, Triton is contracted to design and build both projects including full M&E and fit out provisions as well as new perimeter fencing.The building work is expected to be complete by autumn 2021.