United Kingdom-Reading: Instruments for measuring flow, level and pressure of liquids and gases – Framework Lead
The current contract for Instruments for measuring flow, level and pressure of liquids and gases – Framework Lead is projected to end on 11-MAR-22 and may be available for retender.
Description:
Title attributed to the contract by the contracting entity:: FA1143 Portable Gas Detectors.
Type of contract and location of works, place of delivery or of performance: Supplies
A combination of these
Main site or location of works, place of delivery or of performance: Whole of Thames Water region.
NUTS code
Information on framework agreement: Framework agreement with a single operator
Duration of the framework agreement
Duration in months: 84
Short description of the contract or purchase(s):: Thames Water is the UK’s largest water and wastewater services provider supplying over 14 million customers, operating in the London Thames Valley areas. Thames Water have adopted a new ‘integrated’ approach to sourcing its Portable Gas Detection Units (PGD Units) requirements include PGD supply, spares and repairs and maintenance. It is intended to award a Framework Agreement to a successful supplier(s) capable of supplying both these products and services.
This FA is based upon the product and service requirements as shown below, comprising of 1 lot covering all the Thames Water geographic regions, which includes the supply of portable gas detection units (PGD units), spare parts and repair and maintenance services:
*Lot 1 Supply of PGD Units, spare parts and R&M services: The scope will cover the purchase and supply of PGD Units and spare parts, product selection, manufacture, at-works test, provision of drawings, supply, packing, delivery, on-site testing, commissioning, provision of associated documentation and necessary certification and warranties and operator / maintenance training of all applications. In addition R&M services will cover the planned and reactive maintenance of Thames Water PGD Units for instance, but not limited to, sensor calibration, repair, overhaul and servicing services. Repair may include all necessary PGD Unit ancillaries, sensors, batteries, battery re-chargers etc. Services required may include efficiency testing, removal and disposal of PGD Units and spares from site, delivery and commissioning. Work will cover both on- and off-site work.
This new Framework Agreement would supersede any the existing contracts or agreements. Thames Water also reserves the right to make no award as a result of this procurement process, or may award in part or in whole. Preference will be given to applicants who can meet both the supply and services criteria, as set put above.
Any agreement awarded would be for an initial duration of 3 years with options to extend annually up to a maximum length of 7 years. This would be subject to satisfactory reviews on price and supplier performance.
Suppliers may be invited to conduct a product trial(s) during the ITN evaluation phase of this tender process to test the feasibility of the proposed PGD units and operational model. During this trial, the supplier(s) will also be assessed on their performance and if the supplier(s) do not perform satisfactorily then Thames Water will stop the trial early. Upon completion of the trials Thames Water will review the results and may adjust its PGD Unit strategy, this may be within the scope of this award or be subject to a separate sourcing exercise.
Thames Water aim to develop successful partnerships based on the principle of innovation, collaboration and sustainability, with the aims of (1) delivering the very best in health and safety performance, (2) delighting our customers and (3) delivering exceptional value for money based on a TOTEX approach (a collaborative investment decision based on both the total operational and capital expenditure throughout the assets life). To drive continuous improvement, the measurement & reporting of key performance indicators (KPI) via monthly reports, participation in quarterly Supplier Relationship Management (SRM) review meetings.
Information about variants: Variants will be accepted: yes
Information about renewals: This contract is subject to renewal: yes
In the case of renewable contracts, estimated time-frame for subsequent calls for competition:
in months: 84 (from the award of the contract)
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.