Market Leads & Opportunities

Premier Modular gets Chertsey hospital expansion

Source: https://www.theconstructionindex.co.uk/all-construction-news

Offsite construction specialist Premier Modular has a £9.8m contract for new facilities at a Surrey hospital.Working with Claritas (formerly AMCM) as delivery partner, Premier Modular will install a two-storey unit at St Peter’s Hospital in Chertsey for the Ashford & St Peter’s Hospitals NHS Foundation Trust.Designed by BDP and P+HS, the building will house a priority assessment unit. It will be linked to the emergency department and integrated with the main hospital’s services. It will have 62 patient bays, nurse stations, staff rooms, seminar rooms, laundry, clean utilities, and kitchenettes.Premier Modular is maximising construction and fitout work offsite to reduce disruption to patient care. This means it will only be on site for just over six months.Completion is expected by summer 2021,The offsite solution has been engineered to maintain patient flows between the existing facilities and the new unit, with continuous level floors throughout. Externally, the assessment unit will be finished in vertical rainscreen cladding in shades of grey and brickwork to complement adjacent buildings.The building envelope has been designed to be highly thermally efficient to reduce running costs and carbon emissions, and the picture windows will have solar control glass and integral brise soleil sunshading. A building energy management system (BeMS) will optimise energy use.