web-banner-marketing2

Market Leads & Opportunities

Supply and Commission Gantry Crane – PA – Short Deadline

Type of document: Contract Notice
Country: United Kingdom

1. Title: SUPPLY AND COMMISSION GANTRY CRANE – PA – SHORT DEADLINE
2. Awarding Authority: Balfour Beatty VINCI JV HS2, GB. Web: www.balfourbeattyvinci.com
3. Contract type: Supply contract
Competitive Quotation
4. Description: The Awarding Authority have been awarded HS2 main works civils contracts for the Area North project in the Specific Location
We are looking to engage with the steel fabricators in the supply chain whom provide Fabrication drawings and the ability to manufacture steel capping beams for concreting works.
Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
About the buyer’s selection process:
When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following:
Integrity
Leadership
Respect
Safety
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
Making HS2 affordable
Delivering on promises
We build with people in mind
Delivering more than a railway
Achieving more together
Creative and challenging
Successfully shortlisted supplier’s will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier’s may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
On selection, shortlisted supplier’s will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence.
About the buyer:
BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north.
More about BBV:
VINCI is the largest contractor in the world
Balfour Beatty is the largest contractor in the UK
BBV have been working together for the past 30 years, their first project being the channel tunnel.
For more information please visit our website www.balfourbeattyvinci.co.uk
5. CPV Code(s): 51511110, 42414200, 42414000, 42414100, 42414210, 45200000, 42414500, 45255400
6. NUTS code(s): UKG, UKG3, UKG31, UKI
7. Main site or location of works, main place of delivery or main place of performance: West Midlands
BBV HS2 MWCC North
8. Reference attributed by awarding authority: 12354-HS2 MWC North
9. Estimated value of requirement: Not disclosed
10. CompeteFor response deadline 11.3.2022 (12:00:00).
11. Address to which they must be sent: Note: This is a CompeteFor opportunity. Opportunities may be with both public and private sector businesses. To apply, please click the following link to register on the CompeteFor portal Web:
12. Other information: Opportunity Method Contract Opportunity
Opportunity Status Open
Opportunity Type Private Sector
Notice Type Notice
Supply chain ID 12354-HS2 MWC North
Nature of Opportunity Goods
Procedure type Competitive Quotation
Estimated contract value (GBP) Not disclosed
Business Categories
Installation services of cranes.
Overhead travelling cranes.
Cranes, mobile lifting frames and works trucks fitted with a crane.
Cranes.
Travelling crane.
Works for complete or part construction and civil engineering work.
Bridge cranes.
Fabrication work.
CompeteFor response deadline 11/03/2022 12:00
Estimated tender close date 01/04/2022
Estimated contract award date 20/05/2022
Estimated contract start date 19/06/2022
Estimated contract end date 31/12/2022
Opportunity Posted Date 03/03/2022
Is SME Yes
Is VCO No
Is framework agreement No
Additional information for bidders Include any special notes for bidders Gantry Crane-Technical
Lifting and Placing slabs up to 15 T in P12-P19 and P20-P30
Dimensions limited by Curzon 2
Slabs supplied by the SPMT with loading rack at deck level, supplied by mobile crane from ground level
Assembly at P12, change transversal dimension from P19 to P20 (10,5m->6,5m), dismantling at P30
Slabs placing:
Longitudinal movement by the whole crane
Transversal movement by hoist trolley build in the crane
Longitudinal adjustment movement for precision by the hoist
Vertical movement by hoist
Downstream legs stood directly by girders. Clearance required between studs
Upstream legs stood by the slabs. System to move forward the rail built in the crane
Retractable platform to control placing by both sides of slab
Full Scope of Works will be available at ITT stage.
TKR-202233-EX-1781661