Market Leads & Opportunities
United Kingdom-Sheffield: Sustainable Aviation Fuel Plant (Fischer-Tropsch)
Type of document: Invitation to tender
Country: United Kingdom
OJEU Ref: (2022/S 079-214085/EN)
Nature of contract: Supply contract
Procedure: Open procedure
Type of bid required: Global bid
Contract notice
Supplies
Section I: Contracting authority
I.1) Name and addresses
Official name: The University of Sheffield
Town: Sheffield
Postal code: S10 2TN
Country: United Kingdom
Contact Person: David Middle
Email: dave.middle@sheffield.ac.uk
Internet address(es):
Main address:
I.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge,at:
Additional information can be obtained from:
the above mentioned address
Tenders or requests to participate must be submitted:
to the above mentioned address
Electronic communication requires the use of tools and devices that are not generally available.
Unrestricted and full direct access to these tools and devices is possible,free of charge,at:
I.4) Type of the contracting authority
Body governed by public law
I.5) Main activity
Education
Section II: Object
II.1) Scope of the procurement
II.1.1) Title: Sustainable Aviation Fuel Plant (Fischer-Tropsch)
Reference number: 3321/DM
II.1.2) Main CPV code: 09000000
II.1.3) Type of contract: Supplies
II.1.4) Short Description: The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
II.1.5) Estimated total value:
Value excluding VAT: 3455000.00 Currency: GBPII.1.6) Information about lots:
The contract is divided into lots: Yes
Tenders may be submitted for all lots
Maximum number of lots that may be awarded to one tenderer 8
II.2) Description
II.2.1) Title: Feed gas clean up and conditioning module
Lot No:1A
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 250000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Biomass syngas clean up and conditioning module (as add-on to Lot 1A)
Lot No:1B
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 125000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Reverse Water Gas Shift (RWGS) module
Lot No:2
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 800000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Blending Skid
Lot No:3
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 100000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Fischer-Tropsch reactor
Lot No:4
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 1000000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Hydrocracking and hydrogenation reactor
Lot No:5
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 900000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Distillation module
Lot No:6
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 180000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
II.2.1) Title: Online process analyser
Lot No:7
II.2.2) Additional CPV code(s)
38970000, 73000000, 73110000
II.2.3) Place of performance
Nuts code: UKE32
Main site or place of performance:Translational Energy Research Centre at The University of Sheffield
II.2.4) Description of the procurement:
The University of Sheffield’s Translational Energy Research Centre (TERC) is one of the largest and best-equipped national R&D centres in Europe for zero-carbon energy, hydrogen, bioenergy, and Carbon Capture, Utilisation and Storage (CCUS). We are looking to procure a sustainable aviation fuel (SAF) pilot plant based on Fischer-Tropsch technology. The plant will be required to produce at least 1.5 litres/h of sustainable aviation fuel to Jet A-1 ASTM specification D1655 (with flash point minimum of 38°C and a freeze point maximum of -47°C). The SAF plant will utilise CO2 extracted from bioenergy exhaust gases and on-site generated green H2 as feedstocks. It will also have the option to use biomass syngas from an onsite gasifier.
The tender is for a full turn-key solution including: design, build, installation and commissioning of all elements of the plant from cleaning and preparation of the feed gases, through to conversion of CO2 and H2 to syngas; reaction of the syngas in an FT reactor; and product upgrading steps to achieve the desired product. The selected tenderer will be the Principal Designer and the Principal Contractor for the project with respect to CDM regulations.
II.2.5) Award criteria
II.2.6) Estimated value:
Value excluding VAT: 100000.00 Currency: GBP
II.2.7) Duration of the contract,framework agreement or dynamic purchasing system
Start: 2022-07-01End: 2023-02-28
This contract is subject to renewal: no
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted yes
II.2.11) Information about options
Options yes
Description of options: As described within the tender documents
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:yes
Identification of the project:ERDF
Section III: Legal, economic, financial and technical information
III.1) Conditions for participation
III.1.1) Suitability to pursue the professional activity,including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:As per tender documents
III.1.2) Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3) Technical and professional ability
Selection criteria as stated in the procurement documents
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure:
Open procedureIV.1.8) Information about the Government Procurement Agreement(GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2) Administrative information
IV.2.2) Time limit for receipt of tenders or requests to participate
Date: 2022-06-03 Local time: 12:00
IV.2.4) Languages in which tenders or requests to participate may be submitted:EN
IV.2.7) Conditions for opening tenders
Date: 2022-06-03 Local time: 12:00 Place:The University of Sheffield, Finance Department
Section VI: Complementary information
VI.1) Information about recurrence:
This is a recurrent procurement: no
VI.2) Information about electronic workflows
Electronic ordering will be used
Electronic invoicing will be accepted
Electronic payment will be used
VI.4) Procedures for review
VI.4.1) Review body
Official name: University of Sheffield
Town: Sheffield
Postal code: S10 2TN
Country: United Kingdom
VI.4.4) Service from which information about the review procedure may be obtained
Official name: The University of Sheffield
Town: Sheffield
Postal code: S10 2TN
Country: United Kingdom
E-mail: dave.middle@sheffield.ac.uk
Internet address:
VI.5) Date of dispatch of this notice:2022-04-19
More Opportunties
- United Kingdom-Leicester: PNC Link
9 May 25
NDI PNC link (installation, configuration, IT training for PNC Fasttrack, incl. remote installation of Cleartone) NDI PNC Link - Cleartone XML RTU Five Years.> > - Welding Equipment – Energy Transition Skills Hub
9 May 25
A key part of the Energy Transition Skills Hub will be welding facilities which will provide hands on training for NESCol students and the wider community. This tender relates to the Welding Equipment. The overall refurbishment plan, requires> > - United Kingdom-York: Supply and Installation of Tractor
9 May 25
Askham Bryan College is looking to procure a new compact tractor to support land-based education and training, equipping students with industry-relevant skills and certifications.> >