Market Leads & Opportunities

United Kingdom-Milton Keynes: Safety barriers – Framework Lead

Source: Tracker Intelligence

The current contract for Safety barriers – Framework Lead is projected to end on 13-JUN-23 and may be available for retender. The Supply of Barrier Machines for Level Crossings.
The Supply of Barrier Machines for Level Crossings.
Network Rail’s current Barrier Machine specification (BR843) was written in 1991 and barrier technology has moved on significantly over time, as have the materials that are commonly used. Barrier Machines are the number 1 reliability issue at level crossings. The barrier boom and barrier machine power pack are 2 of the prominent reliability issues and requirements for theses are being updated as part of a technology agnostic performance specification which has been developed to modernise the design, mitigate known reliability issues and allow other barrier machines technologies and materials to be considered.
Network Rail’s current Barrier Machine specification (BR843) was written in 1991 and barrier technology has moved on significantly over time, as have the materials that are commonly used. Barrier Machines are the number 1 reliability issue at level crossings. The barrier boom and barrier machine power pack are 2 of the prominent reliability issues and requirements for theses are being updated as part of a technology agnostic performance specification which has been developed to modernise the design, mitigate known reliability issues and allow other barrier machines technologies and materials to be considered.
Common procurement vocabulary (CPV): 34928300, Safety barriers, 34632200, Electrical signalling equipment for railways,