Market Leads & Opportunities
United Kingdom-Milton Keynes: Safety barriers – Framework Lead
The current contract for Safety barriers – Framework Lead is projected to end on 13-JUN-23 and may be available for retender. The Supply of Barrier Machines for Level Crossings.
The Supply of Barrier Machines for Level Crossings.
Network Rail’s current Barrier Machine specification (BR843) was written in 1991 and barrier technology has moved on significantly over time, as have the materials that are commonly used. Barrier Machines are the number 1 reliability issue at level crossings. The barrier boom and barrier machine power pack are 2 of the prominent reliability issues and requirements for theses are being updated as part of a technology agnostic performance specification which has been developed to modernise the design, mitigate known reliability issues and allow other barrier machines technologies and materials to be considered.
Network Rail’s current Barrier Machine specification (BR843) was written in 1991 and barrier technology has moved on significantly over time, as have the materials that are commonly used. Barrier Machines are the number 1 reliability issue at level crossings. The barrier boom and barrier machine power pack are 2 of the prominent reliability issues and requirements for theses are being updated as part of a technology agnostic performance specification which has been developed to modernise the design, mitigate known reliability issues and allow other barrier machines technologies and materials to be considered.
Common procurement vocabulary (CPV): 34928300, Safety barriers, 34632200, Electrical signalling equipment for railways,
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
