Market Leads & Opportunities
Green light for development of six new cycle routes across London
The Mayor of London, Sadiq Khan, today confirmed how the next stage of his record investment into new cycle routes will be spent, announcing the six routes where design work will begin immediately (January 30th).The six new routes, across nine London boroughs, have some of the highest potential for cycling but currently lack safe infrastructure.Transport for London’s (TfL’s) innovative Strategic Cycling Analysis identified the top 25 connections where new cycling infrastructure is required to enable more people to cycle. Further work between TfL and the boroughs has identified these six routes as the initial routes to take forward to the design stage. The routes will extend from Tottenham in the north, to Peckham in the south, and from Barking in the east, to Willesden Junction in the west, helping to create a pan-London network of high-quality cycle routes.The new routes are an important further step in making the investment required to achieve the Mayor’s aim, set out in the draft Mayor’s Transport Strategy, of 80 per cent of journeys being made by foot, bike or public transport by 2041. In doing so, they will improve Londoners’ health, tackle congestion and clean up London’s air.TfL and the boroughs will now begin design work on:Lea Bridge to DalstonThis 3km route would link the City and Waltham Forest by filling the gap between Lea Bridge Road and Cycle Superhighway 1 at DalstonIlford to Barking RiversideThis 8km route would link two bustling outer London town centres and a major growth area with up to 10,800 new homes and a new London Overground connection – while enhancing access to the Elizabeth line and London Overground servicesHackney to the Isle of DogsThis 8km route would stretch from Hackney to the Isle of Dogs via Canary Wharf, Mile End and Victoria ParkRotherhithe to PeckhamThis 4km route would link Peckham with key and growing destinations such as Canada Water and Surrey Quays, and connect up other cycling routes such as Quietway 1 and the proposed Cycle Superhighway 4Tottenham Hale to CamdenThis 8km route would connect major town centres and will cover seven junctions identified as being among the 73 with the worst safety recordsWembley to Willesden JunctionThis 5km route would be north-west London’s first major cycle route, connecting Wembley, Stonebridge Park and Willesden Junction. Future sections will connect to planned infrastructure in west London such as CS9 and CS10.The Mayor is also committed to providing a new river crossing between Rotherhithe and Canary Wharf for pedestrians and cyclists, which ultimately could link the proposed cycle routes between Hackney and Peckham to create a continuous 12km cycle route. An initial review of the recent consultation on the proposed Rotherhithe and Canary Wharf Crossing showed strong support for the project. TfL is still analysing all the responses and will be announcing the full results of the consultation in the coming months.
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
