Market Leads & Opportunities
United Kingdom-Belfast: Lift-maintenance services – Framework Lead
The current contract for Lift-maintenance services – Framework Lead is projected to end on 02-JUL-19 and may be available for retender.
Description:
Title attributed to the contract by the contracting authority:: Stair Lifts Framework.
Type of contract and location of works, place of delivery or of performance: Services
Service category No 1: Maintenance and repair services
Main site or location of works, place of delivery or of performance: Northern Ireland.
NUTS code UKN
Information on framework agreement: Framework agreement with several operators
maximum number of participants to the framework agreement envisaged: 3
Duration of the framework agreement
Duration in months: 48
Estimated total value of purchases for the entire duration of the framework agreement
Estimated value excluding VAT:
Range: between 1 600 000 and 2 400 000 GBP
Short description of the contract or purchase(s): The Housing Executive wishes to procure suitably qualified and competent persons to provide a comprehensive service for the installation, removal, repair and a call out service for stair lifts currently installed in approximately 1 200 of the Housing Executive’s properties across Northern Ireland.
Stair lifts are installed in the Housing Executive’s domestic dwellings to allow a disabled person access to the first floor of the dwelling. The Housing Executive have two types of lifts to be maintained/installed:
1. Straight Flight Stair lifts;
2. Curved Rail Stair lifts.
The Service required will comprise of the following items of work to the Housing Executive’s stair lifts in domestic dwellings:
– Service and Maintenance of all lifts;
– Assessment and completion of repairs to lifts;
– Replacement of worn and defective parts;
– Installation of new lifts or stored previously used lifts;
– Removal and disposal, or refurbishment and storage of lift units;
– Response to call outs 24hrs/day, 7days/week;
– Testing of lifts as directed by the Housing Executive.
The stair lift framework will be for a period of 4 years. There will be three members of the new stair lifts framework but it is intended to only award one term service short contract (‘TSSC’) under the Framework through a mini-tender competition. The two framework members not awarded the TSSC will be called on to provide the service should the appointed contractor fail to perform. The TSSC will be for an initial two years, and the Housing Executive will have the option to extend the service period by such period(s) as the Housing Executive sees fit provided that the cumulative period of such extension(s) shall not exceed two years from the date of the expiry of the initial service period.
The maintenance and servicing of the lift units will be carried out in accordance with the specification and the terms and conditions of the TSSC. The service will occur in occupied buildings and in most cases in and around dwellings occupied by persons with disabilities and special needs.
Additional instructions may be issued by the Housing Executive, requested through job requests, for additional services to be provided outside the main service.
The provision of the service is required during normal working hours (9:00 to 20:00 on Mondays to Fridays inclusive and from 9:00 to 13:00 on Saturdays including all annual and public holidays) and includes the provision of an emergency response service outside Normal Working Hours so that total cover is given 24 hours per day, every day of the year for the duration of the contract awarded. This includes all weekend and holiday periods.
Further details of the Housing Executive’s requirements are set out in the documentation available from the contact point set out at I.1) above.
Information about variants: Variants will be accepted: no
Information about renewals: This contract is subject to renewal: yes
Number of possible renewals: 2
In the case of renewable supplies or service contracts, estimated timeframe for subsequent contracts:
in months: 12 (from the award of the contract)
More Market Leads
- Committee to decide on more than 100 homes in Somerset
26 Feb 25
Plans for more than 100 homes in Somerset will go before committee today (25 February). - Funding for Argyll and Bute housing projects
26 Feb 25
The UK Government has committed to delivering a package of support from the CRP to Argyll and Bute Council totalling £20.34 million. - Lead developer sought for city centre redevelopment
26 Feb 25
Hull City Council says it has taken a step forward on its redevelopment of the former BHS building in the city centre.
