Market Leads & Opportunities

United Kingdom-Birmingham: Construction structures and materials; auxiliary products to construction (except electric apparatus) – Framework Lead

Source: Tracker Intelligence

The current contract for Construction structures and materials; auxiliary products to construction (except electric apparatus) – Framework Lead is projected to end on 21-APR-20 and may be available for retender. Building Materials and Managed Services.
Midland Heart are looking to procure a Building Materials and Managed Services contract for the Property Care needs of the business.
Midland Heart are looking for a high quality solution for the specified Building Materials and Managed Services contract from high quality providers that deliver a service that is demonstrably focused around the needs of Midland Heart. Tenderers are requested to study the ITT document and any attachments in detail and ensure that the specified requirements can be met that are stated within the document and thus your understanding of our requirements is reflected in your Pricing schedule return.
The contract for Building Materials and Managed Services is expected to commence 1.3.2016, with the exact dates to be agreed depending on the agreement between the successful provider and Midland Heart.
The basis of the contract will include:
– The supply and delivery of building materials and associated managed services. It includes plumbing and heating equipment, kitchens and bathrooms, light plumbing and heating equipment, kitchens and bathrooms, light building materials, heavy building materials, timber, sheet materials, joinery, PPE, safety equipment/training and corporate work-wear, pipeline equipment, plant hire/supply and the hire of building related equipment and associated services. To include stores facilities and managed services;
– Contractor able to improve efficiency, drive down costs of our repairs services through competitive sourcing, ensuring van stocks are optimised and the right materials are readily available to aid Property Care in driving continuous performance improvement. Midland Heart will reserve the right to split the supply of materials if it makes economic sense to do so. This is not a preferred option at the moment and suppliers need to make proposals assuming a sole supplier arrangement for the bulk of our requirements.
The estimated spend per annum is 1 200 000 GBP.
All Suppliers must meet the minimum criteria set within the Invitation To Tender document of:
1. Conformance to mandatory requirements,
2. Tenderer Questionnaire requirements,
3. Quality Questions – Standard requirements, special items and excluded items, Product standards, COSHH documentation, timber products, E-Commerce, minimum stock range.
The contract duration is 2 years with an option to extend for a further 1 + 1 years.
Supplier are advised that TUPE will apply to this contract.
Common procurement vocabulary (CPV): 44000000,