
Market Leads & Opportunities
Fiber Dispenser: Supply and Delivery – OMa – Short Deadline
Type of document: Contract Notice
Country: United Kingdom
1. Title: FIBER DISPENSER: SUPPLY AND DELIVERY – OMA – SHORT DEADLINE
2. Awarding Authority: Balfour Beatty VINCI JV HS2, GB. Web: www.balfourbeattyvinci.com
3. Contract type: Supply contract
Open
4. Description: About the Opportunity:
The Awarding Authority have been awarded the HS2 Northern Section Main Works contract.
We are looking to engage with suppliers to provide wide circular steel structures: manufacturing and delivery of 2 No. of shutter cans, which will be part of the sealing system used during TBMs launching at Bromford East Portal.
Further details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
5. CPV Code(s): 42968000
6. NUTS code(s): UKK, UKK1, UKK11, UKG
7. Main site or location of works, main place of delivery or main place of performance: West Midlands
BBV HS2 MWCC North – Avonmouth
8. Reference attributed by awarding authority: Not provided.
9. Estimated value of requirement: Not provided.
10. CompeteFor response deadline 3.11.2021 (12:00:00).
11. Address to which they must be sent: Note: This is a CompeteFor opportunity. Opportunities may be with both public and private sector businesses. To apply, please click the following link to register on the CompeteFor portal Web:
12. Other information: Opportunity Method Contract Opportunity
Opportunity Status: Withdrawn
Opportunity Type: Private Sector
Nature of Opportunity: Goods
Estimated contract value (GBP): Not disclosed
About the buyer’s selection process:
When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following:
Integrity
Leadership
Respect
Safety
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
Making HS2 affordable
Delivering on promises
We build with people in mind
Delivering more than a railway
Achieving more together
Creative and challenging
Successfully shortlisted supplier’s will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier’s may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
On selection, shortlisted supplier’s will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence.
About the buyer:
BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north.
More about BBV:
VINCI is the largest contractor in the world
Balfour Beatty is the largest contractor in the UK
BBV have been working together for the past 30 years, their first project being the channel tunnel.
For more information please visit our website www.balfourbeattyvinci.co.uk
Details of specialist staff required (if any): Manufacturers of specialized steel structures
Business Categories
Batch processing services.
Dosing plant.
Dispensers.
Construction Categories
Supplier – materials
Plant and equipment hire
Estimated tender close date: 30/11/2021
Estimated contract award date: 17/12/2021
Estimated contract start date: 03/01/2022
Additional information for bidders Include any special notes for bidders: The works to be undertaken under this scope of works includes:
The manufacturing of 2 shutter cans, 2 stiffener structures and 2 pairs of legs according to drawings (communicated at tender stage),
The manufacturing and assembly on the main steel structures in factory of several ancillaries (studs, couplers…to be detailed)
The delivery on site of the 2 shutter cans, 2 stiffener structures, 2 pairs of legs and ancillaries (bolts…) permitting the first site assembly of each shutter can.
The works to be undertaken DOES NOT include:
The manufacturing and delivery of the 2 seal cans, seal can bracings and ancillaries associated to seal can.
TKR-20211027-EX-1715444
More Opportunties
- United Kingdom-Belfast: QUB/2712/25 Supply, Delivery, Installation, Consumables, Commissioning and Maintenance of a Dual Capillary Rheometer for the characterisation of polymer and composite materials
27 May 25
Queen’s University of Belfast wishes to procure a Dual Capillary Rheometer, to measure material flow properties under elevated temperature as a function of shear rate of polymer and composite materials. For a comprehensive description of the requirements> > - Samsung Z20 Ultrasound System
27 May 25
Direct award via NP167/22 Framework following product trial> > - United Kingdom-Eastleigh: Specialist Material Framework
27 May 25
Framework for the supply of specialist materials to support operations across Abri's operating area. To include lots for: glazing, flooring, ironmongery, fencing, grounds maintenance consumables, fire doors, paint and adaptation equipment.> >