1. Title: STEEL STRUCTURE MANUFACTURING – SHORT DEADLINE
2. Awarding Authority: ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine), GB. Web: www.alignjv.co.uk
3. Contract type: Supply contract
4. Description: The supply and delivery of 4 steel structures worth 300T in total to be manufactured in accordance with our drawings.
5. CPV Code(s): 14622000, 45223210, 45262400
6. NUTS code(s): UKG, UKG3, UKG31
7. Main site or location of works, main place of delivery or main place of performance: HS2 C1
Delivery point C1 section_Denham.
8. Reference attributed by awarding authority: Not provided.
9. Estimated value of requirement: Not provided.
10. CompeteFor response deadline 28.5.2020 (11:30).
11. Address to which they must be sent: Note: This is a CompeteFor opportunity. Opportunities may be with both public and private sector businesses. To apply, please click the following link to register on the CompeteFor portal Web:
12. Other information: Opportunity Method Contract Opportunity
Opportunity Status Open
Opportunity Type Public Sector
Notice Type Notice
Nature of Opportunity Goods
Estimated contract value (GBP) Not disclosed
About the buyer’s selection process:
The package will be competitively tendered and assessed against a split between commercial (price) and non-commercial/technical criteria – The intention of the Contractor that these works will be tendered as 1 enquiry, however we reserve the right to split the works and award the package to more than 1 sub-contractor – we do not anticipate this award going to more than 2 contractors.
About the buyer:
In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.
Estimated tender close date 02/06/2020
Estimated contract award date 15/06/2020
Estimated contract start date 05/10/2020