1. Title: TUNNEL BORING MACHINE TOILETS – SHORT DEADLINE
2. Awarding Authority: ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine) , GB. Web: www.alignjv.co.uk
3. Contract type: Supply contract
4. Description: To supply and deliver 8 no. toilets for our Tunnel Boring Machines.
Semi-permanent toilets to be installed on the TBM
Toilet itself should be removed from its place, with method of emptying it.
Limited intervention of emptying the toilet is a major consideration
Supplier to provide approx. duration required before toilet needs to be emptied
4 no. toilets per TBM – 8 no. total required
Self-contained including washing facilities
Electrically powered
The first delivery date (4 no.) = 03/05/2021
The second delivery date (4 no.) = 15/05/2021
5. CPV Code(s): 24955000, 24950000, 33710000, 45332400, 45330000
6. NUTS code(s): UKG, UKG3, UKG31, UKI
7. Main site or location of works, main place of delivery or main place of performance: Delivery point C1 section_Denham
HS2 C1
8. Reference attributed by awarding authority: Not provided.
9. Estimated value of requirement: Not provided.
10. CompeteFor response deadline 12.2.2021 (17:00:00).
11. Address to which they must be sent: Note: This is a CompeteFor opportunity. Opportunities may be with both public and private sector businesses. To apply, please click the following link to register on the CompeteFor portal Web:
12. Other information: Opportunity Method Contract Opportunity
Opportunity Status Open
Opportunity Type Public Sector
Notice Type Notice
Nature of Opportunity Goods
Estimated contract value (GBP) Not disclosed
About the buyer’s selection process:
The package will be competitively tendered and assessed against a split between commercial (price) and non-commercial/technical criteria. The intention of the Contractor that these works will be tendered as 1 enquiry, however we reserve the right to split the works and award the package to more than 1 sub-contractor – we do not anticipate this award being to more than 2 contractors.
About the buyer:
In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.
Estimated tender close date 15/03/2021
Estimated contract award date 14/04/2021
Estimated contract start date 03/05/2021
TKR-202126-EX-1550941