Hinkley Point C: Two years into construction
Hinkley Point C is the first nuclear power station to be built in the UK for more than 20 years. It will have the capacity to generate safe, reliable, low-carbon electricity; enough to power around 6 million homes over an anticipated lifespan of 60 years.
Take a look at some of the achievements that have been made during the first two years of construction.
For more information visit: edfenergy.com/hpc