Replacing the Glass Floor at Tower Bridge

For the first time since their installation 10 years ago, we’ve been given access to see the sacrificial layer of the Glass Floors on the High-level Walkways at Tower Bridge being replaced, 42 metres above the River Thames. Although this work takes place every 18 months or so, it is usually one of the many behind-the-scenes tasks at this working London icon.

 

Source: Tower Bridge