Sector - Transport & Infrastructure
Final stage of £1M Parkeston pumping station overhaul underway
Work is set to get underway on the final stage of a £1M scheme to refurbish a vital pumping station in north-east Essex.
Located at the lower end of the Ramsey/Dock River, the Parkeston pumping station near Harwich, helps to protect homes and businesses in the area from the risk of flooding and is currently undergoing a two-year overhaul.
Jackson Civil Engineering is undertaking the largest and final stage of the work – the replacement of the debris screen, the concrete river banks and a footbridge. New piping will also be installed for emergency pumps, should they be needed. The pumps can lift up to three tonnes of water a second, so the station needs to have a debris screen to ensure they do not get blocked with vegetation and rubbish.
Environment Agency project lead Robert Brown said parts of the structure had been deteriorating due to age and need replacing: “The work will ensure the pumping station can provide the best possible level of flood protection to the low lying areas of Parkeston and Ramsey.
“Without the weed screen the pumps would block and the water levels would rise significantly until they reached the lowest point of the railway embankment.
“We have also been reviewing our emergency plans for the site. In the unlikely event the site has a problem we can set up large temporary pumps. Currently, this would involve closing the railway line, so we are installing permanent pipework to allow the railway to continue to operate.
“The Ramsey/Dock River cannot naturally flow into the Stour estuary so all of the water, including flood water, needs to be lifted up by the pumps into the estuary.”
The work will start in early June and last for around 18 weeks.
If you would like to read more articles like this then please click here.
Related Articles
More Transport & Infrastructure News
- How technology can improve supply chain resilience in infrastructure project delivery
5 Apr 24
Major infrastructure projects rely on supply chains being resilient in the face of unexpected challenges.
- Lincolnshire gateway approved
2 Apr 24
Plans to transform part of the East Lincolnshire coast have taken an important step forward
- Lord Banner KC to lead review on national infrastructure
25 Mar 24
Top planning barrister, (Lord) Charles Banner KC, will lead an independent review to look into