Sector - Commercial
Leisure facilities on the rise as Brexit approaches
14 Feb 20

Some readers might recall reports stating that the hotel construction subsector is set to flourish in the wake of Brexit, and also as a result of the recent political strife, with a weakened pound making Britain a cheaper holiday destination for both foreign and domestic holiday makers. But, with a peak in hotel construction comes a corresponding peak in the construction of leisure facilities.
According to recent construction market data from Glenigan, the construction of leisure facilities such as gyms, cinemas, swimming pools, bowls centres, and dance studios are set to significantly increase in the new decade on account of a rising demand that comes with an increase in hotel construction.
Specifically, these figures state that the construction of indoor leisure facilities and cinemas increased by a proportion of 62 per cent in the three months up to December 2019, when compared against the same three month period in 2018, with projects starts at a combined value of £200M starting onsite in the final quarter of last year.
Ultimately, this surge in leisure construction could prove beneficial to local communities as recent figures from Sports England revealed that 63 per cent of swimming pools and leisure centres in England are more than ten years old, making them outdated and unappealing to local people.
Therefore, a spike in leisure centre construction combined with trends of young people going out to mixed-activity bars, including the likes of bars in urban areas which possess ping pong halls and bowling alleys, could substantially boost the popularity of exercise and improve public wellbeing as a welcome side-effect.
Some notable projects of this type include the £29.1M redevelopment of the Royal Parade Leisure Centre in Eastbourne, which is being undertaken by BAM Construction in Summer, with the project set to last for a total duration of 16 months.
Another such scheme includes the delivery of a £26M redevelopment at the Sands Leisure Centre in Carlisle, Cumbria, where work is set to commence this Spring and continue for 21 months. And finally, a £20.7M project to construct the Camberley Leisure Centre in Surrey has also recently been approved.
If you would like to read more articles like this then please click here.
More Commercial News
- Southern Construction Framework announces Suppliers’ Days ahead of £5.4 billion tender
4 Mar 26
Southern Construction Framework (SCF) will be hosting a series of Suppliers’ Days part of its
- How to Start 2026 in control
16 Jan 26
Six leadership moves for more profitable construction firms in 2026.
- Multi-billion pound funding for new devolved regions
6 Jan 26
A long-term investment package of almost £6 billion has been confirmed for six new devolved
-
Sector Press Releases
- Tidal defences to get the once-over with new dry sprayed concrete
Engineering contractors can save valuable time on tidal defence repairs.
- What is monocouche render?
Monocouche render is a fantastic product. It’s long-lasting, low-maintenance, and through-coloured.
- How to clean mould in your bathroom
Black mould is a common problem in bathrooms. As the humid and enclosed environment provides the ideal conditions
- Top 5 things to do when self-isolating
Here are a few ideas from Saint-Gobain Weber to help with the self-isolation period.
- How to reduce noise pollution in homes
Unwanted noise can interfere with people’s daily routine and affect quality of life.
- The advantages of monocouche render
Saint-Gobain Weber explains the long list of advantages to using monocouche renders.
-
Sector Case Studies
- Back from the brink: repair over demolition
With its brutalist concrete structure deteriorating, the imposing Hatfield Road multi-storey car park in Slough
- Yale trucks help Bonduelle stay cool under pressure
Yale industry experts understand the challenges associated with moving perishable goods
- Yale optimises forklift fleet at Borgers plant with Hispaman
Borgers had a fleet of 20 electric trucks featuring a diverse range of models.
- Maintaining the edge: the specialised Yale solution
Logistics operators need to be confident that their products arrive in the best condition.
- Yale works together with Nissan Italy in central Italy
Active since 1988, the spare parts centre covers 10,000 square metres.
- eInvoicing solution helps Osborne work smarter
Osborne automate the electronic receipt of invoices to its COINS system.





